Modules / Construction

Construction

Daily progress, manpower, welding and NDE, punch lists to closure.

Used by Construction manager, superintendents, material controller, QC inspectors

EPCIMA PMT Construction screen.
Construction · overview

What it does

What happens in the yard, recorded the day it happens: progress per work area against plan, who was on site, what was welded and tested, and what is still open on the punch list. We track material identity from receipt to consumption.

What the dashboard reads from it

  • Construction progress vs plan
  • Manpower on site
  • Welding rejection ratio
  • Open punch items

How the work flows

2 flows · 11 steps · 1 gate

A day on site

Four entries a day, and the S-curve draws itself.

  1. Activity progressSuperintendent
  2. ManpowerSite admin
  3. EquipmentSite admin
  4. Welding and NDEQC
  5. AcceptanceConstruction managergate
  6. S-curve and histogramFrom the entriesautomatic

Material on site

Stock is what was received minus what was issued. Construction asks, the warehouse issues.

  1. Receipt at siteWarehouse, from E-Procurementfeed
  2. Issue requestConstruction
  3. IssueSite warehouse
  4. Return or scrapCondition recorded
  5. ReconciliationPer tagautomatic

Gate: cannot pass until recordedPortal: the outside party does this stepAutomatic: the system does it

Screens

EPCIMA PMT Construction: Progress by activity.
Progress by activity
EPCIMA PMT Construction: Manpower on site.
Manpower on site
EPCIMA PMT Construction: Welding log and NDE.
Welding log and NDE

Screens from the working product. The project data is illustrative, and company and people names are replaced. Click a screen to enlarge.

What is inside

16 capabilities in 4 groups

Progress

  • Activities per work area with planned and actual quantity
  • Planned % vs actual % per activity
  • Construction S-curve from the daily entriesautomatic
  • Completion by disciplineautomatic
  • Accepted flag per activity

People and equipment

  • Manpower by trade, direct vs subcontractor, per day
  • Manpower histogram planned vs actualautomatic
  • Equipment register and usage log

Quality on site

  • Welding log per joint: welder, date, NDE type, result
  • Welding rejection ratio against targetautomatic
  • NDE backlogautomatic
  • Repair flag per weld

Material control

  • Stock balance per tag from receipts and issues
  • Issue requests from construction to the site warehouse
  • Returns with condition; damaged goes to the scrapyard
  • Material identity from MRR to consumption

How it connects

RecordsStay in this module. Entered once, with an owner and a date.
DashboardsL1 to L3 read a snapshot of this module on a schedule and print where the number came from.
RolesOne identity across modules. Vendors and the client see only their own packages.
Source per projectManual register in PMT, or the module feed, chosen in Config per project.

See Construction on your project.

A short walkthrough on your own project structure. Send us your WBS and we load it in before the call.